208
3. Choose either the cooling operation or the heating operation.
Choose SW
○
5 or
○
6.
Choose
○
5 for the cooling operation, and choose
○
6 for the heating operation.
By choosing
○
5 , the wired controller indicates priority to the cooling operation.
By choosing
○
6 , the wired controller indicates priority to the heating operation.
11.17.4 CHECK AFTER COMPLETING INSTALLATION
Check the signals to make sure the each setting switch operates properly.
Be sure that choosing
○
2 to enable cooling/heating selector.