Installer Manual Fleck 3150 - NXT - Programming
Ref. MKT-IM-010 / B - 28.05.2018 59 / 122
TRIP POINT 3 1 to 3997 L/m This screen will only display for system
14 and will only appear with the system
sized to 4 on the master controller
(Valve address #1).
Use the SHIFT button to move to the
left.
TRIP DELAY 3 30 to 99
Second
(30 seconds default)
REGENERATION
DAY OVERRIDE
OFF to 99 Day
Days between regenerations for
timeclock mode.
REGENERATION
TIME
00:00:00 to
23:59:59
Hour
Regeneration time will not appear
unless regeneration day override or
timeclock is on.
CYCLE 1
OFF to
04:00:00
CYCLE 2
OFF to
04:00:00
CYCLE 3
OFF to
04:00:00
CYCLE 4
OFF to
04:00:00
CYCLE 5
OFF to
04:00:00
Hour
This screen will only display when
cycle 4 is not OFF.
AUXILIARY
RELAY
Enabled -
Not compatible with CPO AUX
activation.
Disabled (Default)
AUX RELAY
OUTPUT START
00:00:00 to
18:00:00
Hour
Only displayed if auxiliary relay is
enabled in previous screen.
Auxiliary relay will only display if
chemical pump is OFF for system
types 6 & 7.
AUX RELAY
OUTPUT END
00:00:00 to
18:00:00
CHEMICAL
PUMP
Enabled - This screen will only display on the
lead (#1) unit for system types 6 & 7.
For all other system types, it will
display for all units.
Disabled (Default)
CPO AUX RELAY
VOLUME
1 to 9’999 L
Activate the relay output during a
service based upon the volume of
treated water. Relay is activated for a
set time after every set volume is
treated. Not compatible with aux. relay
activation.
CPO AUX RELAY
TIME
00:00:00 to
02:00:00
Hour
Parameter Options Definition Note