57
SERIES FE
LOW-PRESSURE GAS REGULATOR | COMMISSIONING | REV. 00
EN
Use, maintenance and warning manual
7 - COMMISSIONING
7.1 - GENERAL WARNINGS
7.1.1 - SAFETY REQUIREMENTS FOR COMMISSIONING
HAZARD!
During commissioning the risks associated with any discharges to the atmosphere of ammable or nox-
ious gases must be evaluated.
HAZARD!
In case of installation on distribution networks for natural gas, consider the risk of explosive mixtures
(gas/air) forming inside the piping, if the line is not subjected to inerting.
WARNING!
During commissioning, unauthorised personnel must be removed.
NOTE!
Commissioning must be carried out by authorised and qualied personnel.
Before commissioning the equipment, it is necessary to check that all shut-off valves (inlet, outlet, bypass if any) are
closed.
Commissioning
Operator qualication • Commissioning technician.
PPE required
WARNING!
The PPE listed in this table is related to the risk associated with the equipment.
For the PPE required to protect against risks associated with the workplace,
installation or operating conditions, please refer to:
• the regulations in force in the country of installation;
• any information provided by the Safety Manager at the installation facility.
Tab. 7.36.