EasyManua.ls Logo

Polaris ACE 900 2018

Polaris ACE 900 2018
512 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.6
9929422 R02 - 2017-2019 ACE 900 Service Manual
© Copyright Polaris Industries Inc.
FRONT BEARING CARRIER INSTALLATION
1. Install the lower ball joint into the bearing carrier
using PA-51600. Install lower ball joint nut
q
and
torque to specification. Install anew cotter pin
w
.
TORQUE
Lower Ball Joint Nut:
45 ft-lbs (61 Nm)
2. Install drive shaft axle through the backside of the
bearing carrier.
3. Install lower A-arm assembly onto vehicle frame.
Torque new bolts to specification.
TORQUE
Lower Control Arm Fasteners:
42 ft-lbs (57 Nm)
4. Attach shock to A-arm with fastener. Torque lower
shock bolt to specification.
TORQUE
Shock Mounting Fastener:
42 ft-lbs (57 Nm)
5. Install the upper joint end into the front bearing
carrier.
6. Install a new upper ball joint pinch bolt
e
and nut.
Torque to specification.
TORQUE
Ball Joint Pinch Bolts:
42 ft-lbs (57 Nm)
7. Install the fastener retaining the front stabilizer bar
link to the upper control arm. Torque fastener to
specification.
TORQUE
Stabilizer Link Fasteners:
42 ft-lbs (57 Nm)
8. Apply Anti-Seize to drive shaft axle splines.
9. Install front wheel hub assembly
r
, cone washers
t
,
and hand tighten the castle nut. Install washers with
domed side out.
FINAL DRIVE

Table of Contents

Related product manuals