Chapter 4 Installation and commissioning
21
9.160~220kW G3 main circuit terminal
Figure 4-12:160~220kW G3 main circuit terminal
10.250~400kW G3 main circuit terminal
Figure 4-13:250~400kW G3 main circuit terminal
11.450~630kW G3 main circuit terminal
Figure 4-14:450~630kW G3 main circuit terminal
Note: P/+ standard is circuit standard configuration is for the shorted state; if external DC reactor
is connected, firstly disconnect and then reconnect.