5. Reinstall the Drive Roller, see "Drive Roller Replacement" on page131.
6. Reinstall the Take-up Roller, see "Take-up Roller Replacement" on page136.
7. Center and square the running belt onto the Take-up and Drive rollers, tension the belt
to specification and verify the belt tracking, see "Running Belt Tension and Tracking
Adjustment" on page55.
8. Reinstall the hood cover, see "Covers and Panels Replacement" on page70, and
left/right Landing Trim covers, see "Covers and Panels Replacement" on page70.
9. Connect the power cord and switch the ON/OFF circuit breaker ON.
10. Reset the maintenance Belt Rating after a new deck/belt replacement. Open the Main-
tenance Belt Rating screen and select Replacement (Access Hardware Validation
service menu (51765761) , select : Maintenance > Belt Rating > Replacement).
11. Do the Operation Verification tests (see "Operation Verification" on page19) and return
to service.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 146
6 Replacement Procedures
Running Belt and Deck Replacement Procedure