22 A26361-K878-Z102-2-7619
Installation Steps Hardware Installation
4.1 Installation Steps
The following installation steps are described in detail in other sections of this
chapter:
Ê Unpacking the server (see next section “Unpacking the Server” on page 22).
Ê Mounting the server into the rack (see the layout arrangement created with
System-Architect on the order lists and section “Installing/Removing the
Server into/from the Rack” on page 23).
Ê Cabling the server. Please also refer to the Technical Manual for the corre-
sponding rack and the section “Instructions on Connecting and Discon-
necting Cables” on page 38.
Ê Connect the server to the power supply (see section “Connecting the Server
to the Line Voltage” on page 37).
4.2 Unpacking the Server
V CAUTION!
Please note the safety instructions in chapter “Important Notes” on
page 11.
Do not unpack the server until it is at its installation location.
Ê Transport the server to the place where you want to set it up.
It is recommended not to throw away the original packaging material as it may
be required for transportation at a later date.
Ê Unpack all individual parts.
Ê Check the delivery for any damage during transport.
Ê Check whether the delivery agrees with the details on the delivery receipt.
The identification rating plate is located on the rear area on the server.
Notify your supplier immediately should you discover that the delivery does not
correspond to the delivery receipt.
I If the HDD modules are provided with a transport lock (see figure 21 on
page 50) remove these.
Keep the transport locks in case you want to transport the server again.