EasyManua.ls Logo

Rain Bird IQ - Cartridge Installation; Access Controller Cabinet

Rain Bird IQ
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
IQ Network Communication Cartridge
Cartridge Installation
This section provides steps required to install an IQ-NCC
and connect the required cables. The steps apply to all types
of cartridges with any dierences explained separately.
Access Controller Cabinet
A
Unlock and open the outer door of the ESP-LX Series
Controller.
B
To open the controller front panel; grasp the crescent-
shaped handle on the right-hand side of the front
panel.
1
2
C
Pull the handle towards you and swing it to the left.
3