EasyManua.ls Logo

Rauch QUANTRON-A AXIS-M 20 Q - 4 Operation QUANTRON-A; Control Unit Activation

Rauch QUANTRON-A AXIS-M 20 Q
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation QUANTRON-A
29
4
4 Operation QUANTRON-A
4.1 Control unit activation
Requirements:
The control unit is connected properly to the mineral fertiliser spreader and the
tractor (for an example, see chapter 3.3: Connecting the control unit, page 21
).
A minimum voltage of 11V is guaranteed.
n CAUTION
Risk of injury due to ejected fertiliser
In the case of a fault, it is possible that the metering slide will open
unexpectedly during road transportation to the spreading location.
There is a risk of slipping and personal injury due to ejected fertil-
iser.
Before leaving for the spreading location the electronic
control unit QUANTRON-A must always be switched off.
NOTICE
AXIS-M EMC (+W) only
The settings in each menu are very important for optimal
automatic mass flow control.
Make sure you observe the following menu entries in particular:
In the Fertiliser settings menu
- Spreading disc., see Page 49
.
- PTO speed, see Page 49
.
In the Machine settings menu
- AUTO/MANUAL operation, see Page 58
and chapter [5].
NOTICE
The operating manual describes the control unit functions QUANTRON-A as of
software version 3.10.00.

Table of Contents

Related product manuals