EasyManua.ls Logo

REMEHA Selecta - 4.6 Installation data

REMEHA Selecta
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
20 mm
When shortening, pay attention
to the 20 mm difference.
Fig. 12 Flue cutting instruction
pdf
* Detailed instructions for measuring and cutting flue are included with our horizontal
flue kit.
4.6 Installation data
4.6.1 Condensate drain
The condensate drain from the boiler must be connected to a suitable wastewater
drainage point, preferably within the building. The connecting pipe and fittings must
be made of plastic material only. After assembly, fill the siphon with water. The slope
of the drain pipe should be at least 30 mm/m. If pipe runs are made external to the
building they should always be insulated.

Table of Contents

Related product manuals