EasyManua.ls Logo

Retsch SR 300 - Page 23

Default Icon
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
First Commissioning
23
Fig. 10: Positioning the base
Place the base (UG1) on the cross bar (UG2) and use the four supplied M8x20 hexagon
socket countersunk head screws (UG1.1) to tighten the base.
NOTICE The base should be positioned in such a way, that the left edge of the base is located
90 mm from the outer edge of the left roller rail (UG3).
If necessary, adjust the position of the sliding blocks (UG2.2).
Fig. 11: Screwing tight the base
Place the SR 300 on the base frame.
Use the four supplied M8x35 hexagon socket head screws (UG1.2), including the locknuts
and washers, to screw the U-profiles of the SR 300 tight on the base (UG1).
IM
UG3
UG1
UG2.2
UG1.1
90 mm

Table of Contents

Related product manuals