Page 26 DCN 4727 REV 6 Doc No. C29115
Integration of Rack before Forward Shipping to Data centre
TIP / HEAVY EQUIPMENT
• Not all MoR racks are ship loadable products, please check specification section at the start of this
manual or product cut sheet.
Failure to follow these instructions can result in death, serious injury or equipment
damage.
TIP / HEAVY EQUIPMENT
• This rack is easily tipped. Use extreme caution when handling.
• Instructed or Skilled persons to handle rack only.
• Rack must be attached to pallet and located on a level even floor if forward shipping.
• Rack must be secured before installing or removing equipment, via bolt down or bayed to adjacent
racks.
• Install heaviest equipment first and towards the bottom of the rack to prevent the rack from
becoming top-heavy.
• Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
• Please check bolt down bracket bolt torques before forward shipping.
Failure to follow these instructions can result in death, serious injury or equipment
damage.
Rittal Factory Torque Setting - Rack to Pallet Interfaces
• Bolt down to pallet (M8, HEX HD): 7Nm (7844440)
• Bolt down to pallet (M10, HEX HD): 17Nm (7844477)
To be checked if bolt down has been interfered with.