Commissioning and Maintenance
© robatherm 59
Pos: 68.5 /Inbetri ebnahme und Wartung/Sprühbef euchter/Sprühbef euchter_Einste llwert @ 0\mod_12584758574 61_2008.doc @ 2223 @ 444
Set Value
Setting values for hygienic monitoring can be established from the lowest thickening count:
Value limit for electrical conductivity =
Lowest thickening count x electrical conductivity of fresh water
(Rated value for blow down device or for monitoring with HYGIENECONTROL)
Cleaning interval =
Sump capacity x (thickening count – 1)/ evaporated water quantity
(Setting value for time clock of HYGIENECONTROL)
Note
These settings values are approximations and do not replace the additional monitoring of
germ counts.
We recommend the use of test systems (Dip-Slides). Follow instructions for use.
Fresh Water Pressure
The ball valve is acceptable up to an operating pressure of max. 6 bar.
We recommend a fresh water pressure of at least 3 bar; if necessary install booster system.
Pos: 68.6 /Inbetri ebnahme und Wartung/Adiaba te Abluftbefeuchtu ng @ 2\mod_1378803158959_ 2008.doc @ 32953 @ 4
Adiabatic Humidification of Extract Air
Excessive humidity shall be avoided upstream of the rotor to prevent its matrix from over-
wetting. If ever possible, permeate from the reverse osmosis should be used to operate the
humidifier.
Pos: 68.7 /Inbetri ebnahme und Wartung/_Inbe triebnahme @ 0\mod_12579 29574289_2008.doc @ 2116 @ 3
Commissioning
Pos: 68.8 /Sicher heitshinweise/!Vor sicht_Sicherheitshi nweise beachten_Quer verweis @ 0\mod_125777 7093652_2008.doc @ 2112 @
Caution
Observe general safety instructions on page 3!
Pos: 68.9 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_ATEX-Bauteile erden @ 0\ mod_1257956926546_2 008.doc @ 2126 @
Only use approved parts with ATEX units. All electrical parts must be earthed.
Pos: 68.10 /Inbetri ebnahme und Wartung/Sprühbef euchter/Sprühbef euchter_IBN_ Reinigung @ 0\mod_1258475963 254_2008.doc @ 2224 @ 44 444
Cleaning
Clean foreign bodies out of humidifier sump, clean contamination with water and cleaning
agent (non-foaming, pH-value 7 - 9).
Note
Remove swarf thoroughly, otherwise there is a risk of pitting!
Filling
Fill humidifier sump up to 10 to 20 mm below the overflow connector and set ball valve at
this level by adjusting the knurled screw.
Note
When operating the spray humidifier there must be an airflow of at least 1 m/s (related to
inside cross section of casing) against the spraying direction in order to avoid rectifier
breakdown.
Treated water must be removed from galvanized parts immediately. White rust formation!
Pump
Put pump into operation. Follow instructions of the pump manufacturer.
Pos: 68.11 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_Sprühbefeuchter_I BN_Achtung @ 0\mod_125847 6159696_2008.doc @ 2226 @