Commissioning and Maintenance
68 © robatherm
Pos: 74.1 /Überschri ften/__MSR-Technik @ 0\mod_1257341721201_ 2008.doc @ 2057 @ 2
Controlling Systems
Pos: 74.2 /Inbetri ebnahme und Wartung/_Inbe triebnahme @ 0\mod_12579 29574289_2008.doc @ 2116 @ 3
Commissioning
Pos: 74.3 /Sicher heitshinweise/!Vor sicht_Sicherheitshi nweise beachten_Quer verweis @ 0\mod_125777 7093652_2008.doc @ 2112 @
Caution
Observe general safety instructions on page 3!
Pos: 74.4 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_ATEX-Bauteile erden @ 0\ mod_1257956926546_2 008.doc @ 2126 @
Only use approved parts with ATEX units. All electrical parts must be earthed.
Pos: 74.5 /Inbetri ebnahme und Wartung/MSR- Technik/MSR-Techni k_IBN_Voraussetzunge n @ 0\mod_12585403339 40_2008.doc @ 2245 @ 44
Requirements
All construction requirements such as access, completed unit and duct installation and
uninterrupted availability of all supply facilities must be met. In addition there must be a
possibility of operating the system in the required working phases.
The commissioning may only be undertaken by a qualified company which specialises in
process measurement and control technology.
At the start of the commissioning work, the commissioning engineer will be shown the
system specific locations by a person nominated by the customer.
Work
The following work must be carried out:
Check correct installation of the field units
Check the electrical connections on the switchgear cabinet and the field units
Functional test of sensors, transducers and actuators included in the supply package
Configuration of control and/or DDC substations including loading of project specific
control and SPS programmes
Commissioning with all connected data stations
Adjustment of the parameters to the operating conditions of the technical system, setting
and regulation to the specified rated values and reference variables
Testing of the control programmes
Briefing nominated operating staff during the course of commissioning work
Pos: 74.6 /Inbetri ebnahme und Wartung/_W artung @ 0\mod_125792958525 7_2008.doc @ 2117 @ 3
Maintenance
Pos: 74.7 /Inbetri ebnahme und Wartung/MSR- Technik/MSR-Techni k_Wartung_Wartungsper sonal @ 0\mod_12585404 67905_2008.doc @ 2246 @ 44
Maintenance Staff
Maintenance work must only be carried out by a qualified expert.
Maintenance Contract
A maintenance contract with a company which specializes in process measuring and control
technology is recommended.
Pos: 74.8 /Inbetri ebnahme und Wartung/W artungsintervall_1Jahr /ATEX monatlich @ 0\ mod_1258478957281_2008. doc @ 2243 @ 4
Maintenance Interval
Every year. ATEX units every month.
Pos: 74.9 /Sicher heitshinweise/!Vor sicht_Sicherheitshi nweise beachten_Quer verweis @ 0\mod_125777 7093652_2008.doc @ 2112 @
Caution
Observe general safety instructions on page 3!