Commissioning and Maintenance
© robatherm 53
Pos: 66.1 /Überschri ften/__Gasflächen brenner @ 0\mod_1257341 715607_2008.doc @ 2052 @ 2
Gas Surface Burner
Pos: 66.2 /Inbetri ebnahme und Wartung/_Inbe triebnahme @ 0\mod_12579 29574289_2008.doc @ 2116 @ 3
Commissioning
Pos: 66.3 /Sicher heitshinweise/!Vor sicht_Sicherheitshi nweise beachten_Quer verweis @ 0\mod_125777 7093652_2008.doc @ 2112 @
Caution
Observe general safety instructions on page 3!
Pos: 66.4 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_Gasflächenbrenner _IBN_Vorsicht @ 0\mo d_1258446710420_20 08.doc @ 2208 @
Caution
The CO
2
concentration of the indoor air must not exceed locally prescribed value limits!
Recirculation air operation is not permissible! Do not enter running unit due to danger of
burns.
Pos: 66.5 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_Brennkammer/Gasf lächenbrenner_IB N_ATEX @ 0\mod_1258444798 263_2008.doc @ 2198 @
Operation in explosion hazard zones not permitted. Flush to ensure that no explosive
atmosphere is present before the burner ignites.
Pos: 66.6 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_Gasflächenbrenner _IBN_Achtung @ 0\mod_12 58446787601_2008. doc @ 2209 @
Attention
First commissioning of a gas surface burner or the associated system must be carried out
by the manufacturer or a specialist appointed by the manufacturer following DIN 4794. This
person must be approved by the DVGW as a gas expert. There is a danger of fire if
flammable materials come into contact with the flame.
Pos: 66.7 /Inbetri ebnahme und Wartung/Gasf lächenbrenner/ Gasflächenbrenner_Vor schriften @ 0\mod_1258 446867162_2008.doc @ 2210 @ 444
Regulations
When the unit is installed, the points here must be followed together with any conditions
imposed by the certifying authority, all local regulations and the DVGW and TRGI
requirements must be adhered to precisely.
Connections
Connect controlled gas system to the gas pipe. Ensure that there is no stress on
connections. Type of gas and gas pressure must be suitable for the control system.
Install blow valve outside the building.
Install and wire all sensors and thermostats (room thermostats etc.).
Leak Test
Check gas pipe, connections and gas control system for leaks via testing instrument.
Pos: 66.8 /Sicherheitshinweise/IBN&Wartung/!IBN&Wartung_Brennkammer_IB N_Achtung2 @ 0\mod_125844509 6156_2008.doc @ 2201 @
Attention
Every system must be equipped with an emergency switch.
Overheating damage of combustion chamber, casing, components etc. may occur when
the unit is operated with insufficient cooling (e.g. the unit is switched off via crash switch
and burner is still running) or the units are switched off via safety bodies.
There is a danger of fire if flammable materials come into contact with the combustion
chamber.
Check that there is a good distribution of the airflow at the inlet and outlet of the
combustion chamber!
Pos: 66.9 /Inbetri ebnahme und Wartung/Gasf lächenbrenner/ Gasflächenbrenner_Be triebsbereitschaf t @ 0\mod_1258447018456_ 2008.doc @ 2212 @ 44
Readiness for Operation
Make ready for operation:
Vent gas line.
Check setting of limit value of safety temperature limiter: 60 °C as standard. Suction and
blow openings must be open during operation.