EasyManua.ls Logo

SEI Industries BAMBI MAX - Page 48

Default Icon
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 7: Valve Maintenance
MAX Valve Repair and Replacement
2016 Bambi MAX Service Manual Models 1518-3542 (Version E) 43
We Engineer Solutions
8. Install a piece of 1/8" x 1" heat shrink
over the cable next to the anchor. Cut off
the excess cable as close to cable anchor
as possible.
9. Remove the weight and spacer from the lift bar, install the cable over the five sheaves and trim the
end of the cable. Now, pass the cable to the inside of the carrier cross bolt, through the cable
bushing in the top plate.

Table of Contents

Other manuals for SEI Industries BAMBI MAX

Related product manuals