EasyManua.ls Logo

Sharp PC-1600

Sharp PC-1600
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PC-l600
Step
5
RE1.5
Component
I
ExplanationPart No.
3
4
3-4
SP2
x
2.5
3-5
SP2
x
2.5
2-5
4-6
SP2
x
2.5
2-2
RE1.5
2-3
Paper holder installing plate (Ieft)
I
The paper holder installing plate (right) unit serves as a
unit fixer of the bearing or the platen roller unit (3·3), too.
Set it with the parallel
part
of the bearing
up.
Phillips round head
screws (2)
Paper holder installing plate
(right) unit
Phillips round head
screws
(2)
Pulley support rest (left) unit
Stopper
Phillips round head screw
Idler gear
Retaining ring (E type)
Pulley gear unit
Retaining ring (E type)
The screw-tightening torque is 2.5 kg/cm.
After tightening the screws, hook the paper holder
spring onto the hook of the paper guide A of the frame
(1-1 ).
Press the pulley support rest (Ieft) unit (2-5) into the
frame (1-1).
The screw-tightening torque is 2.5 kg/cm.
Set the pulley gear unit (2-3) to shift into double-gear
with the cog. (Mark the cog first.)
2-2
RE1.5
-76-

Table of Contents

Related product manuals