Operating unit, operating add
on and cover cap (packaging unit)
3
24 | 248
1 Support plate
2 PMI & mainboard
3 Mounting holes of operating unit
4 Lug with securing clip for ribbon cable
5 Hinge
Supplied mounting material
4x M5 screws for securing the operating unit
2x M2.5 screws for securing the hinge of the operating unit
1x
ribbon cable for the connection from the PMI & mainboard to the periphery
board
Inscription set or inscription sheet (only for operating unit)
You will find additional inscription strips, e.g. for the operating add
document A6V10217440.
3.3.2 Cover cap
Figure 6: Rear view of cover cap
1 Distance pins
2 Fixing screw
1