Mounting and assembling a station
Installing the operating unit and the operating add
-
on
5
45 |
248
Building Technologies
A6V10210390_m_en_
--
Fire Safety
2018
-
-
29
Mounting steps
1. From the rear side, hang the operating unit by inserting the hinges (2) into the
openings in the rear panel of the housing (1).
2. Hold the operating unit in place and secure the hinges (2) with the screws (3).
3. Insert the connection cable to the periphery board into the respective plug-in
positions (6 and 9) as shown in the figure.
4. Stick the supplied cable support to the inner right side of the station at the
same height as the cable and fix the flat cable.
5. Guide the cables (2) of the operating unit options to the station as indicated
and fix these cables with cable ties (3).
6. Insert the supplied inscription strips underneath the operating unit foil as shown
in the illustration.
7. Swivel the operating unit towards the station and secure it using the four
screws.
Figure 22: Inserting the inscription strips into the operating unit
1 Inscription LEDs
2 Inscription standard keys 1
3 Inscription standard keys 2
4 Inscription station type
1
2
3
4

Table of Contents

Other manuals for Siemens FS720

Related product manuals