Note
The stability of the optics housing alignment depends on the stability of the construction to
which the process ange is mounted. If the operation site is subject to movements due to, for
instance, thermal changes the optics housings will need repeated realignment. This can be
avoided by mounting the optics housing pair on an external, more stable base, such as concrete
or steel support.
3.5 Installation of the barrier box
When the LDS 6, optics housings CD6 are used in explosive areas a barrier must be installed
between the central unit and the optics housing pair. The barrier and the central unit must be
installed in a safe environment. Technical specications for the connections are given on the
barrier box and the surge protection. For wall mounting the barrier box is equipped with 4
mounting brackets as shown in the following gure.
1 Wall mounting bracket
2 Sealing washer
3 M8 hexagon bolt, 9Nm tightening torque
A wall mounting kit is part of the delivery.
Installing/mounting
3.5Installation of the barrier box
LDS 6 & Optics housing CD 6 Compact Operating Instructions
28 Compact Operating Instructions, 12/2022, A5E03314905-AB