Opdimar Register 3 SPB7-230.033.12 Page 4 of 4 Siemens-Elema AB
Installation Rev. 01 09.02 SPS-UD Solna, Sweden
1 - 4 Prerequisites
Start-up, DHHS and X-ray decree area of application 1
Notes on start-up 1
Opdimar is adjusted, programmed and tested in the factory, leaving only the connection
to the on-site mains voltage, the functional tests and customer dependent adjustments to
be performed.
Checking and recording for the area of application of the X-ray decree
(§16 Germany) 1
An X-ray unit can only be put into operation if an acceptance test has been performed
according to §16 RoeV. It is recommended that the responsible Customer Service
Engineer is present to assist the person responsible for this acceptance test.
Checking and data recording in the USA 1
Maintenance measurements must be made according to the instructions in MAMMOMAT
300/3000, MAMMOMAT 3000 Modular incl. Stereotactic Biopsy Attachment and Opdimar
DHHS Maintenance Instructions.
Sections
• Required labels
• Reproducibility
• Automatic exposure control (AEC)
The result must be recorded in the document MAMMOMAT 300/3000, MAMMOMAT 3000
Modular incl. Stereotactic Biopsy Attachment and Opdimar Measurement Certificates.