7ML19985CN01 Milltronics SF 500 – INSTRUCTION MANUAL Page 11
mmmmm
Installation
LVDT
♦Shields are common, but not grounded to chassis. Run cable shields through SHLD
terminals and ground at SF 500 only.
If separation between the SF 500 and LVDT conditioner exceeds 150 m (500 ft.):
1. remove the jumpers from SF 500 terminal 11/12 and 13/14
2. run additional conductors from:
SF 500 terminal 12 to integrator terminal block ‘+EXC’
SF 500 terminal 13 to integrator terminal block ‘-EXC’
For further connection information on specific LVDTs consult Siemens Milltronics.
EXC+ EXC- COM C.T. SIG-
Standard Red Blue Yellow Black Green
Encapsulated Red Orange White Black Yellow
Note: A common error is missing the connection from SF 500 terminal 2 to SF 500
terminal 17.
flowmeter with
LVDT
Siemens Milltronics LVDT Conditioner
maximum cable run LVDT to Conditioner 300 m (1000 ft.)
Siemens Milltronics
SF 500
*