EasyManua.ls Logo

Siemens RAPIDLAB 248 - Page 68

Siemens RAPIDLAB 248
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Replacing the Pre-heater Tube
Figure 3-41. Removing the Pre-heater Tube
9. Ease the pre-heater tube under the plastic moulding.
10. Re-assemble using the new pre-heater tube assembly. Make sure that:
The pre-heater tube is in the pre-heater groove, and the block
connector is in place.
The reagent inlet connector is in place.
The pre-heater cover and sample detector cover are replaced.
The reagent manifold connector is connected.
The sensors are replaced and seated correctly, and the block cover is
closed.
11. Replace the probe and probe housing, Page 3-26, steps 12 - 16.
12. Lower the front cover and restart the 248.
Page 3-30 248 Operator’s Manual
Reagent Inlet
Connector
Block Connector
Pre-heater Tube
Plastic Moulding

Table of Contents

Related product manuals