EasyManuals Logo

Siemens RAPIDLAB 248 User Manual

Siemens RAPIDLAB 248
135 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
Page 3-4 248 Operator’s Manual
Six Monthly Maintenance
Equipment: As for daily/weekly/quarterly maintenance, plus Bottle
tubing kit (Cat. 673250).
Carry out daily/weekly/quarterly maintenance and:
1. Replace the bottle tubing.
Emptying the Waste Bottle
BIOHAZARD: see Appendix A, Protecting Yourself from Biohazards.
Equipment: Disinfectant or sodium hypochlorite.
The display prompts you to empty the waste bottle. You can choose how
often you want the prompt to appear (see Page 5-5, Setting the
Maintenance Prompts).
1. Stop the 248 system:
a. From Ready press # for menu, 2 for Maintenance and 5 for Stop
System.
2. Remove the waste bottle.
a. Lift the front cover.
b. Carefully pull the waste bottle forwards, tilting the top slightly
away from you.
3. Dispose of the waste in accordance with your laboratory guidelines.
4. The Wash bottle and the 7.3 buffer bottle from the Buffer Pack can
both be used as new waste bottles when they are empty.
a. Peel off the top label from the top righthand corner to expose the
waste label. To use the 7.3 buffer bottle separate the label at the
perforation. Slide the 6.8 buffer bottle off and discard.
Figure 3-1. Separating Buffer Bottles
or press
1 capillary
2QC
Ready
Lift probe to analyze
syringe sample
11:55:12
press
#
for menu
Empty waste bottle
then press
*

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens RAPIDLAB 248 and is the answer not in the manual?

Siemens RAPIDLAB 248 Specifications

General IconGeneral
BrandSiemens
ModelRAPIDLAB 248
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals