Cycle and response times
7
7.1 7.1 Overview
Overview
This section contains detailed information about the following topics:
• Cycle time
• Response time
• Interrupt response time
• Sample calculations
Reference: Cycle time
You can view the cycle time of your user program on the PG.
Reference: Execution time
You can find information in the
S7-300 Instruction List for CPUs 31xC and 31x
. This tabular
list contains the execution times for all
•
STEP 7
instructions the relevant CPUs can execute,
• the SFCs / SFBs integrated in the CPUs,
• the IEC functions which can be called in
STEP 7
.
Reference: Motion Control runtimes
You can find information about runtimes on PROFIBUS DP(DRIVE) in the
S7-Technology
manual.
S7-300 CPU Data: CPU 315T-2 DP
Manual, 12/2005, A5E00427933-02
7-1