Commissioning the CP 440   
 
  Point-to-point connection CP 440 Installation and Parameter Assignment 
58  Manual, 09/2007, A5E00057742-03 
Creating a User Program for the Communication Processor 
CP programming includes the implementation of the CP in the STEP 7 user program of your 
CPU. Program your CP using the language editors of the STEP 7 software. 
Further Information 
A detailed description of programming with STEP 7 is contained in the 
Programming with 
STEP 7
 manual.  
Commissioning the Physical Interface 
If there is no communication with the partner device after configuration has been completed, 
you should test the connection. To do this, proceed as follows: 
1.  What might be the possible cause: 
–  Is the polarity of the send/receive lines reversed?  
–  Are the default settings correct? Several defaults may have been set with different 
polarity. The default settings may already be integrated in the device on a permanent 
basis.  
–  Missing or wrong terminating resistors? 
–  High byte and low byte mixed in the security word (e.g. CRC)? 
2.  How to proceed: 
–  First of all, use the manual to check the line connection: 
- Pin assignment 
- Polarity 
- Default settings 
–  Carry out a setup test 
3. Carry out the simplest setup possible: 
–  Connect only 2 nodes to each another 
–  If possible, use 2-wire cable (RS485) 
–  Use a short cable 
–  Terminating resistors are not required due to the short distance 
–  Send first in one direction and then in the other 