Siemens SIMATIC S7-400 CP 440 - Figure 6-2 Time Sequence Chart for the 9 RECV_440 FB

Siemens SIMATIC S7-400 CP 440
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Communication via Function Blocks
6.3 Using the Function Blocks
Point-to-point connection CP 440 Installation and Parameter Assignment
Manual, 09/2007, A5E00057742-03
97
Time Sequence Chart for the RECV_440 FB
The figure below illustrates the behavior of the NDR, LEN and ERROR parameters,
depending on how the EN_R and R inputs are wired.
(1B5
5
1'5
/(1
OHQJWK
(5525
(QDEOHUHFHLSW
&RPSOHWLRQZLWKRXWHUURU
5HFHLYLQJ
&RPSOHWLRQZLWKHUURU
1RUHFHLSW
5(6(7
&RPSOHWLRQZLWKRXWHUURU
5HFHLYLQJ
&RPSOHWLRQZLWKHUURU
5HFHLYLQJGLVDEOHG
Figure 6-2 Time Sequence Chart for the 9 RECV_440 FB
Note
The EN_R must be set to static "1". During the receive request, the EN_R parameter must
be supplied with RLO "1" (result of logic operation).
See also
Diagnostics Messages of the Function Blocks (Page 117)