S7-GRAPH for S7 300/400 Programming Sequential Control Systems
Glossary-2 C79000-G7076-C526-01
Execution time
The execution time of an instruction is the time during which the instruction
(statement) is active; in other words is being executed.
Interlock
An interlock is a programmable condition within a step. An interlock influences the
execution of individual actions.
Ladder Logic branch
A Ladder Logic branch corresponds to an OR logic operation on elements in a
transition, supervision or interlock.
Normally open contact/normally closed contact
Normally-open contacts and normally-closed contact are bit logic operations. They
can be used as elements in transitions, supervisions or interlocks.
The normally-open contact switches when the Boolean address is set.
The normally-closed contact switches when the Boolean address is not set.
Process image
Memory area on the CPU in which the states of the inputs and outputs is entered.
Process image input table (PII): PII
Process image output table (PIQ): PIQ.
Processing time
The processing time is the time required by the CPU to execute an instruction
(action, condition) and is usually in the ms range per instruction.
Sequencer
A sequencer is the heart of a sequential control system. The program for step-by-
step execution of the sequential control system is created and executed here.
A sequencer consists of a series of steps and transitions that are activated in a
fixed order depending on the step enabling conditions.
An S7-Graph function block can contain up to eight sequencers.