Commissioning
5.5 Options of the VLplus heavy-duty bearing system
BA 2030 (2KJ4)
54 Operating Instructions, 07/2020, A5E50009094A/RS-AL
At an ambient temperature of -10 °C, the actual lubrication time is twice that for the set
temperature.
At an ambient temperature of +40 °C, the actual lubrication time drops to approximately half
that for the set temperature.
Figure 5-7 Lubrication time controller
Procedure
1. Set the lubrication time with a 3 mm Allen key.
2. Note the date of commissioning and the lubrication time on the lubricator.
The times in months listed in the table are guide values.
Table 5- 2 Timing in months on the lubrication time controller
5.5.2 Dry-well version with oil sensor
Please refer to the separate operating instructions for the oil level sensor.
Functional restriction of the sensor
Note the following:
• The sensor must be free of any dirt and residues.
• Do not damage the cables or the insulation.
• Lay the supply line with strain relief.
Avoid strong bending loads, buckling and point mechanical loads.