Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Where the controller is connected to a network and configured to use
NTP the clock will automatically be set when the controller synchronizes
to the NTP server.
7.4.3 Loading IC4 Configuration
The ST950 controller requires an IC4 configuration to be loaded for correct
operation. Configurations can be loaded in two ways:
• using the Status and Configuration → Controller → IC4 Config → Import
Config web page
• using a USB memory stick and WIZ interface.
Full details on how to load an IC4 configuration can be found in the ST950 User
Interface Handbook 667/HU/46000/000.
After loading an IC4 configuration which is significantly different from that previously
in use, it will be necessary to own the Heart. This can be performed in either of the
following ways:
• using the Status and Configuration → Controller → Heart → Ownership web
page
• using the WIZ interface
Full details of this process are given in the ST950 User Interface Handbook
667/HU/46000/000.
7.4.4 Loading Licences
The ST950 requires licences to be fitted before certain facilities can be used. The
facilities which are currently licensed are listed below.
UTMC OTU, MOVA 7 STRMS 1,2,3,4
Each facility is licensed individually and some licences enable more than one
facility. For example the UTMC OTU and MOVA7 licences each enable the Remote
Access facility as this is required to make full use of the licensed feature.