EasyManua.ls Logo

Siemens ST950 - Controller Commissioning

Siemens ST950
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Security classification
Unrestricted
Page
97 of 154
Version
7
Status
Issued
Last Editor
manpreet.jeerh
Date
January 2020
Document Name
ST950 ICM Handbook
Document No.
667/HE/45950/000
Should the controller cabinet base/stool NOT be in-filled with kiln dried
sand and sealed with an approved epoxy resin the controller
electronics/electrical circuits may be damaged.
7.3.13 Re-fit the Controller Electronics
Re-fit the electronics into the controller case, checking that:
All cards are seated correctly in their sockets
The primary connections to the Lamp Supply Transformer have been set to
the correct voltage (Refer to section 4.1.1)
The connections between the Lamp Transformer secondary and the HPU are
correct and are secure
All plugs and sockets are securely mated
All fixings are tight especially those securing cards to side or back panels of
the cabinet.
7.4 Controller Commissioning
The ST950 family of controllers support both the traditional RS232 handset port and
now a USB handset port. The traditional handset commands are supported but the
user will find that the web interface provides a more detailed view of the controller
status to allow easier testing and commissioning.
7.4.1 Controller Setup
The following steps should be performed during commissioning:
If required, remove the CPU Card and fit the optional RTC battery backup kit
(section 7.4.2)
Load the IC4 configuration (section 7.4.3)
Add the required Licence(s) (section 7.4.4)
If required, configure the communications systems (e.g. IP data) (section
7.4.5)
If required, configure and start MOVA referring to the MOVA7 handbook -
667/HB/46000/003
If required, configure and start UTC referring to the UTMC OTU handbook -
667/HB/46000/004
If required, start the Controller Monitor application to report controller status to
Stratos
Set the controller date and time (section 7.4.8)
Bag all signal heads
Perform Lamp tests to ensure correct wiring (section 7.4.9)
Learn the lamp loads (section 7.4.10)
Perform Solar Cell testing (section 7.4.11)