EasyManua.ls Logo

Siemens ST950 - Page 134

Siemens ST950
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mobility, Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Security classification
Unrestricted
Page
134 of 154
Version
7
Status
Issued
Last Editor
manpreet.jeerh
Date
January 2020
Document Name
ST950 ICM Handbook
Document No.
667/HE/45950/000
o Check all the lamp switch card outputs by pulsing each one ON in
turn. This can also detect short-circuits between outputs in the
cabling to the signals.
o Check that each lamp supply relay can switch off the lamp supply
3. Test of non traffic signal aspects of the system. Run when self test initiated
by powering up the controller with the level 3 access button pressed and
tests can also be run at other times using the Tester web page. The tests
run are selected determined by the scenario selected on the Tester web
page. Full details on scenarios are given in the ST950 Facilities Handbook
(667/HB/46000/001) but the scenarios most appropriate to installation and
commissioning are ST950 System Test (the default which is used if no other
choice is made) and ST950 System Test (no licence).
ST950 System Test Scenario
This scenario does not require any special connections and is suitable for running
on most controllers. This is the default scenario.
Figure 60 - ST950 System Test Scenario