16.2 Initial Commissioning of the Multicluster System
1. Carry out steps 1 - 3 in chapter 8.2”Starting the Quick Configuration Guide (QCG)”
(page55).
2. At "New System" set the following parameters:
– Device type (master, slave 1, slave 2, slave 3)
–Voltage/frequency type (230V_50Hz, 220V_60Hz), default setting is "230V_50Hz"
– System configuration (3Phase, 1Phase 1, 1Phase 2, 1Phase 3, 1Phase 4, MC-Box), for
multicluster operation choose "MC-Box". Default setting: "1Phase 1"
– Multicluster configuration (MainCluster, ExtensionClst1, ExtensionClst2, ExtensionClst3,
ExtensionClstN), default setting is "MainCluster"
– Box type choice (MC-Box-6, MC-Box-9, MC-Box-12), preset: "MC-Box-6"
3. For the other settings proceed as described in chapter 8.2”Starting the Quick Configuration
Guide (QCG)” (page55) under point 3.