Initial Commissioning SMA Solar Technology AG
54 SI5048-TEN093630 Technical Description
8 Initial Commissioning
8.1 Requirements
The Quick Configuration Guide (QCG) allows you to quickly install and commission your off-grid
system. To do so, use the menu to select the 'right' system for you. The display then shows a selection
via which the parameters can be set specifically.
Check the connections
Before starting the commissioning process, make sure all electrical connections have the
correct polarity and are connected according to the instructions.
Always save data
Always use the SD card to save data and events. In case of a failure SMA Solar
Technology can thus quickly help you.