HT-NT5
23
2-20. AMP BOARD
2-21. USB-CHUKEI BOARD
Push.
OK NG
front side
left side
,QVWDOODWLRQGLUHFWLRQIRUWKHUDGLDWLRQVKHHW
5 heatsink (SL-plate)
Note 3:
When you install the heatsink
(SL-plate), spread the compound
referring to “SPREADING OF
COMPOUND” on page 8.
4 three screws
(transistor)
:LUHVHWWLQJ
MB-1509
board
AMP
board
1 connector
(CN6006)
The opposite side is the terminal side.
front side
2 FFC 26P
(CN6008)
front side
radiation sheet
6 two screws
(BV3 u 8)
7 screw
(BVTP3 u 8)
7 screw
(BVTP3 u 8)
bottom cabinet block
REPEATER board
Note 2:
Be careful not to damage
the REPEATER board.
3 connector (CN6001)
Note 5:
Before connect this connector,
make sure to refer to
“CAPACITOR ELECTRICAL
DISCHARGE PROCESSING”
on page 4.
rib
rib
hole
hole
8 AMP board
Note 4:
When installing the AMP
board, align the two ribs
and two holes.
radiation sheet
See Note 1
radiation sheet
See Note 1
front side
right side
bottom cabinet block
1 Open the lid (USB).
2 screw
(BVTP3 u 10)
7 FFC 6P
(CN1453)
boss
5 claw
3 wire with lug
This side is the
terminal side.
hole
9 USB-CHUKEI board
Note:
When installing the USB-CHUKEI board,
align the boss and hole.
:LUHVHWWLQJ
Pass the wire with lug underneath
the USB-CHUKEI board.
right side
8 packing
(CZ2)
6 MB-1509 board
cable connector
(CN1451)
4 MB-1509 board cable
connector (CN1401)
Note 1: If the radiation sheet is damaged, be sure to replace them with
new parts.