EasyManua.ls Logo

Stoll CMS 933 - Assembly and Setting up; Preparing Assembly; Preparing Installation Location; Having Tools and Aids Ready

Stoll CMS 933
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly and setting up 4
Preparing assembly 4.1
4-1
4 Assembly and setting up
4.1 Preparing assembly
4.1.1 Preparing installation location
The installation location of the knitting machine must fulfill the following
conditions:
flat, firm surface in a building
sufficient space between the knitting machines for
- Operating the machine
- Removing the fabric pieces from the machine
do not put up the machine underground
4.1.2 Having tools and aids ready
The knitting machine is delivered packed in one of the following ways:
on a transport base packed in film
on a transport base packed in a crate
on trolleys
The following tools and aids are required for all types of packing:
Accessories for knitting machine
- Washers for machine feet
- Grub screws for aligning the machine
- Square spanner for opening the rear machine panel. An Allen key
is necessary for CMS 420 E.
Tool
Level
4.1.3 Transporting machine to installation location
Transport the knitting machine to the installation location in its packing
and remove the packing there.
4.1.4 Unpacking knitting machine
1. When delivered in a crate: Remove crate lid and side sections.
2. Remove boxes with accessory parts from the fabric collection
chamber.
Installation location

Table of Contents

Related product manuals