24
Aenon: Electrical system connecon must be done by licensed electrician.
Warning: When installing the power cord for the rst me, remove the test cable (short wire) from the motor and
replace it with a able (wire) less than #12 gauge. The me interval between motor starts is at least more than 2 sec-
onds. Otherwise the motor or Ac contactor may be burnt out.
Suggest to use min 30A breaker (not higher than the wire load).
5.3-Hydraulic System Tesng
◇ Add about 2.5 gallons of hydraulic oil to the hydraulic uid reservoir,AW32 during winter me (cold weather),
and AW46 during summer me (hot weather).
◇ Make sure there is no oil leak.
◇ Repeatedly raise and lower the li to bleed trapped air from the cylinders.
◇ Power unit tesng. (FIG 25)
FIG 25 Power Unit Diagram
**Important Informaon **
◇ 7 Pressure Valve: Clockwise adjustment increases pressure to make the power, counterclockwise adjustment
decreases pressure to make the power unit to have less power.
◇ 8 Hydraulic Oil Flow Valve: Clockwise adjustment to speed up, counterclockwise adjustment to slow down.
5.4-Load Test
Before tesng, check anchor bolts to make sure they are completely ghtened, and also make sure 2 carriage on both
sides are at the same level (height dierence should be less than 0.39″/10mm).Adjust the cable nut on the shorter
carriage to make sure 2 carriage height at the same level and the 2 cables are similar tension.