13
4-Equipment Installaon
4.1-Assemble Columns
Assemble main column & extension column, and then stand up the 2 columns (the column with the power unit base
plate is the main column and other one is the vice column). (FIG 3)
Note: Don’t drill anchor bolts holes or install anchor bolts now.
FIG 3 Assemble Columns
4.2-Assemble overhead top beam (FIG 4)
4.2.1-Assemble overhead top beam
Note: The bolts run from inside of the column and then fasten the nuts from outside of the column.
FIG 4 Assemble overhead top beam