EasyManua.ls Logo

Stratus SAE-C10C - 4-Equipment Installation; Assemble Columns; Assemble Overhead Top Beam

Stratus SAE-C10C
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
4-Equipment Installaon
4.1-Assemble Columns
Assemble main column & extension column, and then stand up the 2 columns (the column with the power unit base
plate is the main column and other one is the vice column). (FIG 3)
Note: Don’t drill anchor bolts holes or install anchor bolts now.
FIG 3 Assemble Columns
4.2-Assemble overhead top beam (FIG 4)
4.2.1-Assemble overhead top beam
Note: The bolts run from inside of the column and then fasten the nuts from outside of the column.
FIG 4 Assemble overhead top beam

Related product manuals