2-16
2.Basic splicing operationOptical fiber splicing
2. Basic splicing operation
If “Arc Power Too Weak”, “Arc Power Too Strong” or “Arc Center” is displayed,
prepare the fiber again and repeat the test until “Good arc state.” is displayed.
(Refer to the previous page.)
Arc test procedure
3: After “Arc Test Ready” appears, tap
the Set icon or press the Set key
.
An arc test is started.
4: The melt back distance of the left and
right fibers and the arc center position
which are measured via image
processing are displayed on the
monitor screen. (The arc center
position value is displayed only if the
position is shifted.)
2: Tap Arc Test icon .
1: As mentioned in the previous pages,
load a prepared fiber. (The coating is
removed and fiber is cleaved.)
P.2-14 Inserting fibers into the splicer
5: After “Good arc state.” displayed,
begin the fiber preparation
procedure to perform a splice.