EasyManua.ls Logo

Sumitomo Z2C - Inserting the Fiber into the Splicer

Sumitomo Z2C
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-26
2. Basic splicing operationDrop cable splicing
2. Basic splicing operation
1. Open the hood.
2. Load prepared drop cable in the splicer as shown in the picture below
.
4. Close the hood.
5. Start the splicing process.
(Note: Perform an arc test before splicing.)
3. Make sure that the fiber sits in the V-groove correctly.
For use of 40mm protection sleeve
For use of 60mm protection sleeve
Inserting the fiber into the splicer
Groove
For details on arc test and splicing
procedures, please refer to the page
below.
P.2-15 Arc test
P.2-17 Starting the automatic splice

Table of Contents

Other manuals for Sumitomo Z2C

Related product manuals