EasyManua.ls Logo

Sungrow SG8K-D - Installing the Energy Meter

Sungrow SG8K-D
79 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual 4 Mechanical Mounting
21
4. To protect the inverter from
theft, you can lock it with a
padlock. The padlock is
purchased by the user if
necessary. The hole diameter
is about 8 mm.
5. Remove the waterproof lid from RS485 terminal and install the
communication module to the inverter. The following figure takes the
Wi-Fi module as an example. Refer to the manual delivered with the
module for details.
4.5 Installing the Energy Meter
The SUNGROW Energy Meter should be installed between the grid and the
load. It supports a 35 mm DIN-rail installation, as shown in the following figure.
Single-phase Energy Meter
Three-phase Energy Meter
Fig. 4-1 Installing the Meter to the Rail

Table of Contents