1. Check whether the power cable
connections of the meter are correct.
2. Check whether the RS485 connection is
correct.
8.2 Routine Maintenance
Risk of inverter damage or personal injury due to incorrect service!
Always keep in mind that the inverter is powered by dual sources: PV
strings and utility grid.
Before any service work, observe the following procedure.
Disconnect the AC circuit breaker and then set the DC load-break
switch if the inverter to OFF;
Wait at least 10 minutes for inner capacitors to discharge completely;
Verify that there is no voltage or current before pulling any connector.