EasyManua.ls Logo

Suzuki DL1000 - Page 24

Suzuki DL1000
444 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-8 PERIODIC MAINTENANCE
Remove the generator cover plug
1 and timing inspection
plug
2.
Turn the crankshaft to set the No.1 (Front) cylinder at TDC of
compression stroke. (Align the “F | T” line on the generator
rotor to the index mark of valve timing inspection hole and
also bring the camshafts to the position as shown in page
2-7.)
To inspect the No.1 (Front) cylinder tappet clearance, use a
thickness gauge between the tappet and the cam. If the clear-
ance is out of specification, adjust it into the specified range.
$ 09900-20803: Thickness gauge
Turn the crankshaft 270 degrees (¾ turns) to set the No.2
(Rear) cylinder at TDC of compression stroke. (Align the
“R | T” line on the generator rotor to the index mark of valve
timing inspection hole and also bring the camshafts to the
position as shown in page 2-7.)
Inspect the No.2 (Rear) cylinder tappet clearance as the
same manner of No.1 (Front) cylinder and adjust the clear-
ance if necessary.
$ 09900-20803: Thickness gauge
FT
R
R
T
T
RT

Table of Contents

Other manuals for Suzuki DL1000

Related product manuals