EasyManua.ls Logo

Suzuki DL1000 - Installation

Suzuki DL1000
444 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-12 COOLING AND LUBRICATION SYSTEM
INSTALLATION
Install the thermostat.
NOTE:
The jiggle valve
A of the thermostat faces upside.
Install the thermostat case.
Tighten the thermostat case bolts to the specified torque.
$ Thermostat case bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Pour engine coolant. (#2-17)

Table of Contents

Other manuals for Suzuki DL1000

Related product manuals