EasyManua.ls Logo

Suzuki DR-Z125L - Page 85

Suzuki DR-Z125L
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-49
Install the generator stator.
GENERATOR ROTOR
Install the generator rotor securely.
Tighten the generator rotor nut to the specified torque with the
special tool.
! 09930-40113: Rotor holder
" Generator rotor nut: 55 N·m (5.5 kgf-m, 40.0 lb-ft)
Install the kick starter idle gear
1,washer
2 and snap ring
3
to the driveshaft.
#
! 09900-06107: Snap ring pliers
PRIMARY DRIVE GEAR
Install the key
1 onto the crankshaft.
Install the primary drive gear
2 and oil pump drive gear
3.
NOTE:
Position the oil pump drive gear
3, as shown in the illustration.
Use a new circlip
3.

Table of Contents

Related product manuals