34 A-96.250.571 / 050517
AMI Codes-II
Instrument Setup
4. Instrument Setup
After installation according to checklist proceed as following:
4.1. Prepare Reagents
1 Prepare reagents. See Refill or replace Reagents, p. 43.
2 Insert the suction lances into the canisters.
4.2. Peristaltic Pump
The instrument is delivered with opened occlusion frames.
1 Activate the peristaltic pump tubes by closing the occlusion
frame [B].
A
B
C
D
Turn to lock
Occlusion frame
Rotor
Pump tube
A
B
D
C