EasyManua.ls Logo

Swann AMI Codes-II - Calibration

Swann AMI Codes-II
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMI Codes-II
Instrument Setup
A-96.250.571 / 050517 37
4.6. Calibration
1 Calibrate pH sensor (if option pH is installed).
See Standard pH, p. 52.
2 Perform process calibration.
See Process Calibration of DIS, p. 50
If ordered:
Calibration of
pH sensor
The instrument should be operating for 1h before performing a pH
calibration.
Program the two buffers you want to use for calibration (Installation/
Sensors/Standards). Calibrate the pH sensor with two buffers, e.g.
pH 7.00 and pH 9.00. See chapter Calibration, p. 50 for details.
Process DIS Let the instrument run for 1 h.
Use CHEMATEST 25 (or equivalent photometer) to determine the
sample disinfectant concentration. Take the sample directly from
the flow cell. Determine the sample disinfectant value by 3 manual
DPD measurements. Calculate the average value. Compare this
value to the value, indicated by the AMI.
Keep in mind the accuracy of your manual measurement. Only cor-
rect the instrument if the difference is significant.
Perform process DIS if necessary. See chapter Calibration, p. 50
for details.

Table of Contents

Related product manuals