78 A-96.250.571 / 050517
AMI Codes-II
Program List and Explanations
3 Maintenance
3.1 Calibration
In this menu, you can correct measuring values (all disinfectants
and pH) or calibrate offset and slope of pH electrode.
3.1.1 Process DIS: Possibility to correct the disinfectant value. See
Process Calibration of DIS, p. 50, for more details.
3.1.2 Process pH: Only available, if option pH has been installed.
Correction of pH electrode. See Process Calibration of DIS, p. 50,
for details.
3.1.3 Standard pH: Only available, if option pH has been installed.
Calibration of pH electrode with the two standard solutions
programmed in Installation 5.1.3. See Standard pH, p. 52, for
details.
3.2 Service
3.2.1 Verification: Performs a verification using the reference kit. Follow
dialog. See Verification, p. 49
3.2.2 Fill System: Activates the reagent pump.
3.3 Simulation
To simulate a value or a relay state, select the
alarm relay,
relay 1or 2
signal output 1 or 2
with the [ ] or [ ] key.
Press the [Enter] key.
Change the value or state of the selected item with the [ ] or
[] key.
Press the [Enter] key.
The value is simulated by the relay/signal output.
At the absence of any key activities, the instrument will switch back
to normal mode after 20 min. If you quit the menu, all simulated val-
ues will be reset.
Alarm Relay: Active or inactive
Relay 1 and 2: Active or inactive
Signal Output 1 and 2: Actual current in mA
Signal Output 3: Actual current in mA (if option is installed)