EasyManua.ls Logo

Swann AMI Trides - Instrument Setup; Establish sample flow; Programming; Calibration of pH electrode

Swann AMI Trides
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMI Trides
Instrument Setup
A-96.250.111 / 211019 35
4. Instrument Setup
After the analyzer is installed according to the previous instructions,
connect the power cord. Do not switch on power, yet!
4.1. Establish sample flow
1 Open the flow regulating valve.
2 Wait until the constant head is filled, and the rotor of the Trides
sensor starts rotating.
3 Switch on power.
The AMI Transmitter performs a self test, displays the
firmware version and then starts normal operation.
4.2. Programming
Program all parameters for external devices (interface, etc.).
Set all parameters for instrument operation (limits, alarms). See
Program List and Explanations, p. 67
4.3. Calibration of pH electrode
Enter the 2 Standards you want to use for calibration in menu 5.1.5.
NOTICE: The default values of the standards pH 7 and pH 9
corresponds with the standards delivered by SWAN.
Calibrate the pH electrode with two buffers, e.g. pH 7.00 and pH
9.00.
See Process pH, p. 50 or Standard pH, p. 51.

Table of Contents