EasyManua.ls Logo

Sym Mio 100 - Page 101

Sym Mio 100
215 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. V-Belt Drive System / Kick Starter
8-6
Installation
Pull out the sliding driven face and then insert the
drive belt into the driven pulley.
Caution
z Pull out sliding driven face and then insert the
drive belt into the driven pulley so that the
drive belt set can be installed onto pulley
more easily.
Install the clutch set with drive belt onto the drive
shaft.
The other end of belt install onto the movable drive
face.
Install the clutch outer.
Install the clutch with universal fixture, and then
tighten nut to specified torque value.
Torque value: 5.0~6.0kgf-m
Special Service Tool:
Universal fixture SYM-2210100
Caution
z When install the drive belt, if there is a arrow
mark, then the arrow mark must point to
rotation motion. If not, the letters on the belt
must be forwarded to assembly direction.
Sliding
driven face
Universal fixer
Nut
Clutch outer
To this chapter contents

Table of Contents

Related product manuals